1. |
L23CH061 |
Avulasivasankar |
IV/IV B.Tech |
2025-2026 |
Bio Petro Clean India Pvt.Ltd Zero Liquid Discharge (Reverse Osmosis) Plant and Design of RO
in ETP |
29-12-2025 to 27-04-2026 |
Industry |
|
2. |
L23CH062 |
Damerlahariprakash |
IV/IV B.Tech |
2025-2026 |
Bhagiradha chemicals & Industries Ltd
Study On Equipment And Utility Design |
11-12-2025 to 11-04-2026 |
Industry |
|
3. |
L23CH063 |
Dommetileelavenkatadurgasai |
IV/IV B.Tech |
2025-2026 |
RINL Visakhapatnam
A Case study on cleaning process- Coke Oven Gas |
15-12-2025 to 18-04-2026 |
Industry |
|
4. |
L23CH064 |
Dugguramprasad |
IV/IV B.Tech |
2025-2026 |
Coromandel International Ltd Study on Complex Plant & Optimization of Granulation |
22-12-2025 to 22-04-2026 |
Industry |
|
5. |
L23CH065 |
Gudevamsinookaprasad |
IV/IV B.Tech |
2025-2026 |
Coromandel International Ltd
Study of Sulfuric Plant & HAZOP Analysis |
22-12-2025 to 22-04-2026 |
Industry |
|
6. |
L23CH066 |
Karri naveen |
IV/IV B.Tech |
2025-2026 |
Coromandel International Ltd
Study of Sulfuric Plant & HAZOP Analysis |
22-12-2025 to 22-04-2026 |
Industry |
|
7. |
L23CH067 |
Kodali sita ram |
IV/IV B.Tech |
2025-2026 |
RINL Visakhapatnam
A Case study on cleaning process- Coke Oven Gas |
15-12-2025 to 18-04-2026 |
Industry |
|
8. |
L23CH068 |
Medicharla gyanaprasuna |
IV/IV B.Tech |
2025-2026 |
Coromandel International Ltd
Study of Sulfuric Plant & HAZOP Analysis |
22-12-2025 to 22-04-2026 |
Industry |
|
9. |
L23CH069 |
Parimellapruthvisrinivas |
IV/IV B.Tech |
2025-2026 |
Coromandel International Ltd
Study on Complex Plant & Optimization of Granulation |
22-12-2025 to 22-04-2026 |
Industry |
|
10. |
L23CH070 |
Ponnamandakavivarma |
IV/IV B.Tech |
2025-2026 |
RINL Visakhapatnam
A Case study on cleaning process- Coke Oven Gas |
15-12-2025 to 18-04-2026 |
Industry |
|
11. |
L23CH071 |
Rapetiuttej |
IV/IV B.Tech |
2025-2026 |
Coromandel International Ltd
Study on Complex Plant & Optimization of Granulation |
22-12-2025 to 22-04-2026 |
Industry |
|
12. |
L23CH072 |
Surisettychakri |
IV/IV B.Tech |
2025-2026 |
Coromandel International Ltd Study of Sulfuric Plant & HAZOP Analysis |
22-12-2025 to 22-04-2026 |
Industry |
|
13. |
L23CH073 |
Tiruvidulacharansai |
IV/IV B.Tech |
2025-2026 |
Bhagiradha chemicals & Industries Ltd
Study On Equipment And Utility Design |
11-12-2025 to 11-04-2026 |
Industry |
|
14. |
L23CH074 |
Uppalajayalakshmi |
IV/IV B.Tech |
2025-2026 |
BSR Power Construction Pvt Ltd.
Regeneration and Reconditioning of used Transformer Oil |
05-01-2026 to 30-04-2026 |
Industry |
|
15. |
Y22CH001 |
Alasathwikkumar |
IV/IV B.Tech |
2025-2026 |
Bhagiradha chemicals & Industries Ltd
Study On Equipment And Utility Design |
11-12-2025 to 11-04-2026 |
Industry |
|
16. |
Y22CH002 |
Ardhalapudilokesh |
IV/IV B.Tech |
2025-2026 |
Coromandel International Ltd
Study on Complex Plant & Optimization of Granulation |
22-12-2025 to 22-04-2026 |
Industry |
|
17. |
Y22CH003 |
Arudalavarun |
IV/IV B.Tech |
2025-2026 |
Jocil Ltd.
Process Study of Fat Splitting Plant- 4 |
01-01-2026 to 30-04-2026 |
Industry |
|
18. |
Y22CH004 |
Baralajathin |
IV/IV B.Tech |
2025-2026 |
Om Gayathri Agencies
Ethanol Unloading Automation Work |
01-01-2026 to 01-05-2026 |
Industry |
|
19. |
Y22CH005 |
Bezawadagirija |
IV/IV B.Tech |
2025-2026 |
Aurobindo
Design of a Solvent Recovery System |
02-01-2026 to 30-04-2026 |
Industry |
|
20. |
Y22CH007 |
Daraharshitha |
IV/IV B.Tech |
2025-2026 |
Godrej Agrovet Ltd
Solvent Recovery |
22-12-2025 to 30-04-2026 |
Industry |
|
21. |
Y22CH008 |
Gantavenkataramana |
IV/IV B.Tech |
2025-2026 |
Shreas Industries Ltd
Industrial Manufacturing of Chloromethanes: Process |
22-12-2025 to 24-04-2026 |
Industry |
|
|
|
|
|
|
Description, Equipment Design |
|
|
|
22. |
Y22CH010 |
Goddudivya |
IV/IV B.Tech |
2025-2026 |
Smilax Laboratories
Process Optimization & Solvent Recovery |
22-12-2025 to 24-04-2026 |
Industry |
|
23. |
Y22CH011 |
Jannubhumika |
IV/IV B.Tech |
2025-2026 |
Coromandel International Ltd
Study of Sulfuric Plant & HAZOP Analysis |
22-12-2025 to 22-04-2026 |
Industry |
|
24. |
Y22CH012 |
Kesamvenkatalakshmirekha |
IV/IV B.Tech |
2025-2026 |
Nifty Lab Pvt Ltd
Strategic Design & Integration of Utility Systems in Pharmaceutical
API Manufacturing Facilities |
01-01-2026 to 30-04-2026 |
Industry |
|
25. |
Y22CH013 |
Kolluruushasri |
IV/IV B.Tech |
2025-2026 |
Apitoria Pharma Pvt Ltd
Solvent Recovery in Bulk Drug Manufacturing Industry |
02-01-2026 to 30-04-2026 |
Industry |
|
26. |
Y22CH014 |
Kunchalavaraprasad |
IV/IV B.Tech |
2025-2026 |
Bhuvan Bioenergy India Pvt Ltd
Production of Biodiesel from used cooking Oil with Methanol Recovery and Distillation Process
Optimization |
02-01-2026 to 30-04-2026 |
Industry |
|
27. |
Y22CH015 |
Kuppamkrishnaveni |
IV/IV B.Tech |
2025-2026 |
Mohan Spintex India Ltd
Optimizing Power Consumption in ZLD |
10-12-2025 to 09-04-2026 |
Industry |
|
28. |
Y22CH016 |
Lalamvamsi |
IV/IV B.Tech |
2025-2026 |
Vijaya Sri Organics Ltd
Vent Size Calculations |
01-01-2026 to 01-05-2026 |
Industry |
|
29. |
Y22CH017 |
Maddipatilakshminirupkumarch akrapani |
IV/IV B.Tech |
2025-2026 |
Bhuvan Bioenergy India Pvt Ltd
Production of Biodiesel from used cooking Oil with Methanol Recovery and Distillation Process
Optimization |
02-01-2026 to 30-04-2026 |
Industry |
|
30. |
Y22CH018 |
Mallelasiva harsh vardhan |
IV/IV B.Tech |
2025-2026 |
Bhuvan Bioenergy India Pvt Ltd
Production of Biodiesel from used cooking Oil with Methanol |
02-01-2026 to 30-04-2026 |
Industry |
|
|
|
|
|
|
Recovery and Distillation Process Optimization |
|
|
|
31. |
Y22CH020 |
Matanginalini |
IV/IV B.Tech |
2025-2026 |
Apitoria Pharma Pvt Ltd
Solvent Recovery in Bulk Drug Manufacturing Industry |
02-01-2026 to 30-04-2026 |
Industry |
|
32. |
Y22CH021 |
Medisettiramadurgasatyaprasad |
IV/IV B.Tech |
2025-2026 |
Coromandel International Ltd
Study on Complex Plant & Optimization of Granulation |
22-12-2025 to 22-04-2026 |
Industry |
|
33. |
Y22CH022 |
Naidu vasavi |
IV/IV B.Tech |
2025-2026 |
BSR Power Construction Pvt Ltd.
Regeneration and Reconditioning of used Transformer Oil |
05-01-2026 to 30-04-2026 |
Industry |
|
34. |
Y22CH023 |
Nangeddamounika |
IV/IV B.Tech |
2025-2026 |
DRDL Hyderabad Development of silicone based Thermal Protection system for
Ramjet motor Application |
05-01-2026 to 29-04-2026 |
Industry |
|
35. |
Y22CH024 |
Pailasrinuvasu |
IV/IV B.Tech |
2025-2026 |
Coromandel International Ltd Study of Sulfuric Plant & HAZOP Analysis |
22-12-2025 to 22-04-2026 |
Industry |
|
36. |
Y22CH025 |
Paritalaashok |
IV/IV B.Tech |
2025-2026 |
Coromandel International Ltd
Study on Complex Plant & Optimization of Granulation |
22-12-2025 to 22-04-2026 |
Industry |
|
37. |
Y22CH027 |
Ponnagantiharishchowdary |
IV/IV B.Tech |
2025-2026 |
Dr.Reddy’s Pydibhimavaram Development of Solvent Recovery in Drug API
manufacturing Process |
02-01-2026 to 30-04-2026 |
Industry |
|
38. |
Y22CH028 |
Puvvadaprasanna |
IV/IV B.Tech |
2025-2026 |
Neuland Laboratories Ltd
Process Analysis and Performance Evaluation of API manufacturing |
02-01-2026 to 30-04-2026 |
Industry |
|
39. |
Y22CH029 |
Raavivenkatasai |
IV/IV B.Tech |
2025-2026 |
Jocil Ltd.
Process and Utility Analysis of Oil Unloading System |
01-01-2026 to 30-04-2026 |
Industry |
|
41. |
Y22CH032 |
Sujithbabupeddipaga |
IV/IV B.Tech |
2025-2026 |
Bhuvan Bioenergy India Pvt Ltd
Production of Biodiesel from used cooking Oil with Methanol Recovery and Distillation Process
Optimization |
02-01-2026 to 30-04-2026 |
Industry |
|
42. |
Y22CH033 |
Syed rizwan |
IV/IV B.Tech |
2025-2026 |
Bhagiradha chemicals & Industries Ltd
Study On Equipment And Utility Design |
11-12-2025 to 11-04-2026 |
Industry |
|
43. |
Y22CH034 |
Thorati n v ashishphanendrakumar |
IV/IV B.Tech |
2025-2026 |
Bhuvan Bioenergy India Pvt Ltd
Design of Distillation Column for Methanol and Water |
27-12-2025 to 26-04-2026 |
Industry |
|
44. |
Y22CH035 |
Thummalahemanth |
IV/IV B.Tech |
2025-2026 |
Vijaya Sri Organics Ltd
Vent Size Calculations |
01-01-2026 to 01-05-2026 |
Industry |
|
45. |
Y22CH037 |
Yammanurushahanur |
IV/IV B.Tech |
2025-2026 |
Bhagiradha chemicals & Industries Ltd
Study On Equipment And Utility Design |
11-12-2025 to 11-04-2026 |
Industry |
|
46. |
Y22CH038 |
Yelinedikavyachowdary |
IV/IV B.Tech |
2025-2026 |
Bhuvan Bioenergy India Pvt Ltd
Design of Distillation Column for Methanol and Water |
27-12-2025 to 26-04-2026 |
Industry |
|
47. |
L24CH061 |
Akkireddy Kumar |
III/IV B.Tech |
2025-2026 |
ORCH Laboratories India Pvt Ltd |
04-05-2026 to 15-06-2026 |
Industry |
|
48. |
L24CH063 |
Battula Rama Koteswararao |
III/IV B.Tech |
2025-2026 |
SDSC SHAR Sriharikota
Heat Transfer Calculations for Rotary Vacuum dryer |
04-05-2026 to 18-06-2026 |
Industry |
|
49. |
L24CH064 |
Bekkam SriharshaVenkat Reddy |
III/IV B.Tech |
2025-2026 |
HPCL Visakh refinery
Vacuum distillation Process and Bottom Conversion Technologies |
04-05-2026 to 15-06-2026 |
Industry |
|
50. |
L24CH065 |
Bonela Sri Vinay |
III/IV B.Tech |
2025-2026 |
HPCL Visakh refinery
Overview of DHDS-DHT with case study on Heater duty |
04-05-2026 to 17-06-2026 |
Industry |
|
|
|
|
|
|
improvement |
|
|
|
51. |
L24CH066 |
ChattuSrikanth |
III/IV B.Tech |
2025-2026 |
RINL Visakhapatnam
Cryogenic Air Separation through Fractional distillation |
04-05-2026 to 13-06-2026 |
Industry |
|
52. |
L24CH067 |
ChillakuriBalaabhishek Chand |
III/IV B.Tech |
2025-2026 |
HPCL Visakh refinery
Vacuum distillation Process and Bottom Conversion Technologies |
04-05-2026 to 15-06-2026 |
Industry |
|
53. |
L24CH068 |
ChinthaSaiAbhinavaSidhu |
III/IV B.Tech |
2025-2026 |
ORCH Laboratories India Pvt Ltd |
04-05-2026 to 15-06-2026 |
Industry |
|
54. |
L24CH069 |
DoddiLeela Prasad |
III/IV B.Tech |
2025-2026 |
HPCL Visakh refinery
Vacuum distillation Process and Bottom Conversion Technologies |
04-05-2026 to 15-06-2026 |
Industry |
|
55. |
L24CH070 |
DudiJagan Mohan Kumar |
III/IV B.Tech |
2025-2026 |
HPCL Visakh refinery
Vacuum distillation Process and Bottom Conversion Technologies |
04-05-2026 to 15-06-2026 |
Industry |
|
56. |
L24CH071 |
GollangiPrasanth |
III/IV B.Tech |
2025-2026 |
ORCH Laboratories India Pvt Ltd |
04-05-2026 to 15-06-2026 |
Industry |
|
57. |
L24CH072 |
JayanthiLokeshSarma |
III/IV B.Tech |
2025-2026 |
ORCH Laboratories India Pvt Ltd |
04-05-2026 to 15-06-2026 |
Industry |
|
58. |
L24CH073 |
KolliVamsiVenkataVardhan |
III/IV B.Tech |
2025-2026 |
HPCL Visakh refinery
Vacuum distillation Process and Bottom Conversion Technologies |
04-05-2026 to 15-06-2026 |
Industry |
|
59. |
L24CH074 |
NallaJagan Mohan |
III/IV B.Tech |
2025-2026 |
Coromandel International Ltd Overview and Offsite operations of Coromandel International Ltd
Kakinada |
04-05-2026 to 13-06-2026 |
Industry |
|
60. |
L24CH075 |
NattalaVenugopal |
III/IV B.Tech |
2025-2026 |
HPCL Visakh refinery
Vacuum distillation Process and Bottom Conversion Technologies |
04-05-2026 to 15-06-2026 |
Industry |
|
61. |
L24CH076 |
Palavalasa Hitesh Kumar |
III/IV B.Tech |
2025-2026 |
HPCL Visakh refinery Overview of DHDS-DHT with case study on Heater duty
improvement |
04-05-2026 to 17-06-2026 |
Industry |
|
62. |
L24CH077 |
Pasumurthy Siva Teja |
III/IV B.Tech |
2025-2026 |
RINL Visakhapatnam |
04-05-2026 to 13-06-2026 |
Industry |
|
|
|
|
|
|
Cryogenic Air Separation through Fractional distillation |
|
|
|
63. |
L24CH078 |
RejatiVenkataSatyanarayana |
III/IV B.Tech |
2025-2026 |
ONGC Rajahmundry
Analysis of Oil Field Effluent water |
11-05-2026 to 24-06-2026 |
Industry |
|
64. |
L24CH079 |
Tadiboina Dharma Raju |
III/IV B.Tech |
2025-2026 |
JEI Pharma Pvt. Ltd
Solvent Recovery unit |
03-05-2026 to 17-06-2026 |
Industry |
|
65. |
L24CH080 |
ThogatiVenkata Praveen |
III/IV B.Tech |
2025-2026 |
RINL Visakhapatnam Cryogenic Air Separation through Fractional distillation |
04-05-2026 to 13-06-2026 |
Industry |
|
66. |
L24CH081 |
TirupathiRakesh Kumar |
III/IV B.Tech |
2025-2026 |
Dr.Reddy’s Laboratories Vizag
Technical Service Department |
02-05-2026 to 15-06-2026 |
Industry |
|
67. |
L24CH082 |
VeerapurajuBharath Surya |
III/IV B.Tech |
2025-2026 |
SDSC SHAR Sriharikota
Study on Vicous Flow
Characteristics and HAZOP study in rein batching facility |
04-05-2026 to 18-06-2026 |
Industry |
|
68. |
L24CH083 |
Yeti Venkata Krishna Chaitanya |
III/IV B.Tech |
2025-2026 |
IIChE
Petroleum Refinery Engg. |
05-06-2026 to 15-07-2026 |
Online |
|
69. |
Y23CH001 |
AkkenaSudarsanaRao |
III/IV B.Tech |
2025-2026 |
Apotoria Pharma Pvt. Ltd
Technical Service Department |
03-05-2026 to 17-06-2026 |
Industry |
|
70. |
Y23CH003 |
BhrugubandaVenkataSeshaaS hanmukhaSai |
III/IV B.Tech |
2025-2026 |
Anjani Tek Tiles (Vennar Ceramics) |
04-05-2026 to 15-06-2026 |
Industry |
|
71. |
Y23CH004 |
Bojanki Jaya Prakash |
III/IV B.Tech |
2025-2026 |
Dr.Reddy’s Laboratories Ltd –
Viakhapatnam
Technical Service Department |
02-05-2026 to 15-06-2026 |
Industry |
|
72. |
Y23CH007 |
Karimajji Naga Raju |
III/IV B.Tech |
2025-2026 |
Andhra Organics Limited ,Hyd
Training In Production Department |
04-05-2026 to 12-06-2026 |
Industry |
|
73. |
Y23CH008 |
D.V.Venkateswara Reddy |
III/IV B.Tech |
2025-2026 |
Dr.Reddy’s Laboratories Ltd –
Viakhapatnam
Technical Service Department |
02-05-2026 to 15-06-2026 |
Industry |
|
74. |
Y23CH009 |
DulamSaibabu |
III/IV B.Tech |
2025-2026 |
HPCL Visakh refinery
Overview of DHDS-DHT with case study on Heater duty |
04-05-2026 to 17-06-2026 |
Industry |
|
|
|
|
|
|
improvement |
|
|
|
75. |
Y23CH010 |
GadupudiDheemanthSai |
III/IV B.Tech |
2025-2026 |
IIChE
Petroleum Refinery Engg. |
05-06-2026 to 15-07-2026 |
Online |
|
76. |
Y23CH011 |
GarigipatiVarshaChandrika |
III/IV B.Tech |
2025-2026 |
Natural remedies
Comprehensive Review of Herbal |
27-04-2026 to 20-06-2026 |
Industry |
|
77. |
Y23CH012 |
GeddamKalyan Kumar |
III/IV B.Tech |
2025-2026 |
Maithili Life Sciences Pvt Ltd
Development of Production activities |
04-05-2026 to 14-06-2026 |
Industry |
|
78. |
Y23CH013 |
GudivadaSagar |
III/IV B.Tech |
2025-2026 |
Apotoria Pharma Pvt. Ltd
Technical Service Department |
03-05-2026 to 17-06-2026 |
Industry |
|
79. |
Y23CH014 |
Jeevanrao Naga Chuda Jaya Hasini |
III/IV B.Tech |
2025-2026 |
A.R Pharma Pvt. Ltd
Production and QC Department |
01-05-2026 to 15-06-2026 |
Industry |
|
80. |
Y23CH015 |
Kota Manikanta |
III/IV B.Tech |
2025-2026 |
Dr.Reddy’s Laboratories Ltd –
Viakhapatnam
Technical Service Department |
02-05-2026 to 15-06-2026 |
Industry |
|
81. |
Y23CH016 |
KarnatiAkhila |
III/IV B.Tech |
2025-2026 |
Rani Life Sciences Pvt Ltd
Anti-Cancer APIs |
01-05-2026 to 15-06-2026 |
Industry |
|
82. |
Y23CH017 |
Kunchala Praveen Kumar |
III/IV B.Tech |
2025-2026 |
Anjani Tek Tiles (Vennar Ceramics) |
04-05-2026 to 15-06-2026 |
Industry |
|
83. |
Y23CH018 |
MarpuAbhiram |
III/IV B.Tech |
2025-2026 |
Andhra Organics Limited ,Hyd
Technical Service Department |
04-05-2026 to 18-06-2026 |
Industry |
|
84. |
Y23CH019 |
Nakkala Anil Kumar |
III/IV B.Tech |
2025-2026 |
Dr.Reddy’s Laboratories Ltd –
Viakhapatnam
Technical Service Department |
02-05-2026 to 15-06-2026 |
Industry |
|
85. |
Y23CH020 |
PalaparthyHemanthSivavenk ata Kumar |
III/IV B.Tech |
2025-2026 |
RINL Visakhapatnam
Cryogenic Air Separation through Fractional distillation |
04-05-2026 to 13-06-2026 |
Industry |
|
86. |
Y23CH021 |
PoliboinaVasanthi |
III/IV B.Tech |
2025-2026 |
Rani Life Sciences Pvt Ltd
Anti-Cancer APIs |
01-05-2026 to 15-06-2026 |
Industry |
|
87. |
Y23CH022 |
Ravi Harideep |
III/IV B.Tech |
2025-2026 |
Andhra Organics Limited ,Hyd Training In Production Department |
04-05-2026 to 12-06-2026 |
Industry |
|
88. |
Y23CH023 |
RavinuthalaNischalaSaraswat hi |
III/IV B.Tech |
2025-2026 |
Vijaya Sri Organics Ltd
Technical Service Department |
04-05-2026 to 15-06-2026 |
Industry |
|
89. |
Y23CH024 |
SaragadaVamsi |
III/IV B.Tech |
2025-2026 |
Anjani Tek Tiles (Vennar Ceramics) |
04-05-2026 to 15-06-2026 |
Industry |
|
90. |
Y23CH025 |
ShaikNihaz |
III/IV B.Tech |
2025-2026 |
Vijaya Sri Organics Ltd
Technical Service Department |
04-05-2026 to 15-06-2026 |
Industry |
|
91. |
Y23CH026 |
ShaikVasiemAkram |
III/IV B.Tech |
2025-2026 |
Andhra Organics Limited ,Hyd
Training In Production Department |
04-05-2026 to 12-06-2026 |
Industry |
|
92. |
Y23CH027 |
Sirisala Jacob Rakesh |
III/IV B.Tech |
2025-2026 |
Dr.Reddy’s Laboratories Ltd –
Viakhapatnam
Technical Service Department |
02-05-2026 to 15-06-2026 |
Industry e |
|
93. |
Y23CH028 |
SivarathriSyamkoti |
III/IV B.Tech |
2025-2026 |
HPCL Visakh refinery Overview of DHDS-DHT with case study on Heater duty
improvement |
04-05-2026 to 17-06-2026 |
Industry |
|
94. |
Y23CH029 |
Suddapalli Guru Prasad |
III/IV B.Tech |
2025-2026 |
Dr.Reddy’s Laboratories Ltd –
Viakhapatnam
Technical Service Department |
02-05-2026 to 15-06-2026 |
Industry |
|
95. |
Y23CH030 |
ThokachichuHarshitha |
III/IV B.Tech |
2025-2026 |
Rani Life Sciences Pvt Ltd
Anti-Cancer APIs |
01-05-2026 to 15-06-2026 |
Industry |
|
96. |
Y23CH031 |
VanapalliRithija |
III/IV B.Tech |
2025-2026 |
A.R Pharma Pvt. Ltd
Production and QC Department |
01-05-2026 to 15-06-2026 |
Industry |
|
97. |
Y23CH033 |
VedanthamVyshnavi |
III/IV B.Tech |
2025-2026 |
IIT Tirupati |
14-05-2026 to 03-07-2026 |
Industry |
|
98. |
Y23CH034 |
Y.HarithaSai |
III/IV B.Tech |
2025-2026 |
Sangam Milk Producer Company Ltd |
04-05-2026 to 14-06-2026 |
Industry |
|
99. |
L25CH061 |
A.Lokesh |
II/IV B.Tech |
2025-2026 |
Social internship |
|
Social internship |
|
100. |
L25CH062 |
B.Dinesh |
II/IV B.Tech |
2025-2026 |
Yarada-Door to Door Hygiene Awareness-water conservation awareness-Awareness on Heat
waves |
54 hrs |
Social internship |
|
101. |
L25CH063 |
G.Sarath |
II/IV B.Tech |
2025-2026 |
Kranthinagar-Assisting With online applications (Aadhaar,
PAN, etc.)-Teaching basic alphabets, animals, food-nutrition, |
29-05-2026 to 12-06-2026
41 hrs |
Social internship |
|
|
|
|
|
|
names to Anganwadi centre-
Assisting in village surveys and data collection census Center |
29-05-2026 to 12-06-2026
41 hrs |
|
|
102. |
L25CH064 |
J.Sravana Sruthi |
II/IV B.Tech |
2025-2026 |
Uppavaram-Swachh Bharat Activity-Poshan Abhiyan Activity-Tree Plantation Drive |
03-06-2026 to 13-06-2026
40 hrs |
Social internship |
|
103. |
L25CH065 |
K.Chaitanya Sai Kumar |
II/IV B.Tech |
2025-2026 |
Social Internship |
|
Social internship |
|
104. |
L25CH066 |
O.Balasubhashini |
II/IV B.Tech |
2025-2026 |
Nelaballi- Tree Plantation Drive- Mobile Addiction awareness-
Swachh Bharat Activity |
05-06-2026 to 15-06-2026
40 hrs |
Social internship |
|
105. |
L25CH067 |
Md.Khasim |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
106. |
L25CH068 |
T.Bhanu Prakash |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
107. |
L25CH069 |
T.Sanjeev Kumar |
II/IV B.Tech |
2025-2026 |
Vankayalavari street-Tree plantation drives- Door to Door Hygiene Awareness- spoken
English training for children |
02-06-2026to08-06-2026
40 hrs |
Social internship |
|
108. |
L25CH070 |
Y.Yaswanth |
II/IV B.Tech |
2025-2026 |
Medicherla-Awareness on Heat wave and supply Water to villagers-Teaching Basic Maths to Primary School –Conducting Cyber security awareness
program |
26-05-2026 to 02-06-2026
43 hrs |
Social internship |
|
109. |
Y24CH002 |
B.Rohit |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
110. |
Y24CH003 |
B.Lakshmi |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
111. |
Y24CH005 |
B.U.K.Manga Devi |
II/IV B.Tech |
2025-2026 |
Kirlampudi-Tree plantation-Yoga Awareness-Meditation workshop |
29-05-2026 to04-06-2026
52 hrs |
Social internship |
|
112. |
Y24CH006 |
B.Hadassa |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
113. |
Y24CH007 |
B.Tejeswara rao |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
114. |
Y24CH008 |
B.Kumar |
II/IV B.Tech |
2025-2026 |
Social Internship |
02-06-2026 to 13-06-2026
40 hrs |
Social internship |
|
115. |
Y24CH009 |
B.Venkateswara Rao |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
116. |
Y24CH010 |
Ch.Divya |
II/IV B.Tech |
2025-2026 |
Social Internship |
13-06-2026 to16-06-2026
40hours |
Social internship |
|
117. |
Y24CH011 |
Ch.Snehanjali |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
118. |
Y24CH012 |
Ch.Karteek |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
119. |
Y24CH013 |
D.Jyothika |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
120. |
Y24CH014 |
D.Srihari |
II/IV B.Tech |
2025-2026 |
Social Internship |
02-06-2026 to 13-06-2026
40 hrs |
Social internship |
|
121. |
Y24CH015 |
G.Siriha |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
122. |
Y24CH016 |
G.Naga Keerthan |
II/IV B.Tech |
2025-2026 |
Social Internship |
13-06-2026 to16-06-2026
40hours |
Social internship |
|
123. |
Y24CH017 |
G.S.V.Tirupatamma |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
124. |
Y24CH018 |
G.Siva Ramaraju |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
125. |
Y24CH019 |
G.Pavan Teja |
II/IV B.Tech |
2025-2026 |
J.R.Puram- Teaching Basic Maths to Primary School-Teaching
Digital payments-Cleaning village streets |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
126. |
Y24CH020 |
J.Deevena kumari |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
127. |
Y24CH021 |
J.Bhavana |
II/IV B.Tech |
2025-2026 |
Little Hands Organization- Narasaraopet
Recycling used Rice bags-Seed collection and Seed ball making- Collection and distribution of old
clothes |
02-06-2026 to 13-06-2026
40 hrs |
Social internship |
|
128. |
Y24CH022 |
J.Trinadh yadav |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
129. |
Y24CH024 |
K.Yashwanth Surya |
II/IV B.Tech |
2025-2026 |
Suddapalli -Teaching school children-Cyber security
awareness-UPI and Digital payment training |
13-06-2026 to16-06-2026
40hours |
Social internship |
|
130. |
Y24CH025 |
K.Krishna Chaitanya |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
131. |
Y24CH026 |
K.Gowthami |
II/IV B.Tech |
2025-2026 |
Repalle 14 th ward
Tree plantation drive-Teaching basic computer skill to students-
training villagers to use smart phone |
03-06-2026 to 09-06-2026
42.5 hours |
Social internship |
|
132. |
Y24CH027 |
K.Vinathi |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
133. |
Y24CH028 |
K.Siva Rakesh |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social
internship |
|
134. |
Y24CH029 |
M.Rakshitha |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
135. |
Y24CH030 |
M.Sravani |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
136. |
Y24CH031 |
M.Sivani |
II/IV B.Tech |
2025-2026 |
Nizampatnam-Organizing spoken English training for Rural youth- training villagers to use smart
phone- Tree plantation |
03-06-2026 to 11-06-2026
43 hours |
Social internship |
|
137. |
Y24CH032 |
M.Srinadh |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
138. |
Y24CH033 |
M.Manvitha |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
139. |
Y24CH034 |
P.Hima Sri |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
140. |
Y24CH035 |
P.Vardhan Babu |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
141. |
Y24CH036 |
P.Udaya Sai |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
142. |
Y24CH037 |
P.Sowmya Sri Lakshmi |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
143. |
Y24CH038 |
P.Rikshith Prem |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
144. |
Y24CH039 |
P.Swathi |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
145. |
Y24CH040 |
P.Sarath Kumar |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
146. |
Y24CH041 |
R.Varshitha Sai |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
147. |
Y24CH042 |
R.Sai Teja |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
148. |
Y24CH043 |
S.Krishna Sri Sai |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
149. |
Y24CH044 |
S.Dileep Kumar |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
150. |
Y24CH045 |
S.Venkata Aditya |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
151. |
Y24CH046 |
Sk.Fayaz |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
152. |
Y24CH047 |
Sk. Jakeer |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
153. |
Y24CH048 |
Sk.Najiruddin |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
154. |
Y24CH049 |
Sk.Roshan Shah |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
155. |
Y24CH050 |
T.Suresh Babu |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
156. |
Y24CH051 |
U.Bala Saraswathi |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
157. |
Y24CH052 |
V. Sai Gnapika |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
158. |
Y24CH053 |
V.Jyothi Swaroopa |
II/IV B.Tech |
2025-2026 |
Social Internship |
03-06-2026 to13-06-2026
40 hrs |
Social internship |
|
159. |
Y24CH054 |
V.Vijay Kumar |
II/IV B.Tech |
2025-2026 |
Ongole- Teaching Basic Maths to Primary School students- Awareness on prevention of Infectious diseases-organizing
Spoken English training for school students |
02-06-2026 to 09-06-2026
45 hrs |
Social internship |
|
160. |
Y24CH055 |
Y.Ratna Raju |
II/IV B.Tech |
2025-2026 |
East Malapalli-Tree plantation- Awareness on prevention of diseases-Teaching basic computer
language |
24-05-2026 to 13-06-2026
40 hrs |
Social internship |
|
161. |
Y24CH056 |
Y.Sandeep |
II/IV B.Tech |
2025-2026 |
Edulavalasa- Awareness on Heat wave and supply Water to villagers- Teaching Basic Maths to Primary School students Conducting Cyber security
awareness program |
30-05-2026 to 06-06-2026
40 hrs |
Social internship |
|
162. |
Y24CH057 |
Y.Ajay |
II/IV B.Tech |
2025-2026 |
Social Internship |
30-05-2026 to 06-06-2026
40 hrs |
Social internship |